Blank Title
  • Home
  • About Us
  • Our Projects
  • Contact Us
629 Homewood Aveune, Highland Park, IL / Tel: (847) 432-7783 / Fax: (847) 432-4847

projects
before & After


 Historical restoration of Lake Forest Train Station

Project included stripping, cleaning, replacing and repainting all wood members. Repaired and/or replaced stone masonry with new mortar joints throughout. Refinished all windows and existing hardware where viable and/or replaced with like items.
Picture
Picture

bEFORE

Picture
Picture

aFTER


WINNETKA REINFORCED FLOOR REPLACEMENT

Removed 65-year old structurally dilapidated concrete floor in Winnetka's Public Works municipal truck storage facility. Installed 330 tons of CA-6 backfill, 42 tons of epoxy coated rebar and 124 lineal feet of heavy duty trench drain. Later poured 11,000 sq.’ of 10” thick concrete slab (450 cubic yards).
Picture
BEFORE
Picture
AFTER

patty Turner Center

​Removed front entry concrete and asphalt circle drive to reestablish proper ADA slopes. Re-poured concrete walks and re-paved approximately 7,000 sq. feet of new drive.
Picture
BEFORE
Picture
AFTER

sHERWOOD eLEMENTARY sCHOOL

Demolished existing 2,500 sq.’ concrete entry sidewalk and hauled debris away. Reworked layout. Formed and poured new concrete sidewalk.
Picture
BEFORE
Picture
AFTER

Irwin Driveway

Picture
BEFORE
Picture
AFTER

Recent projects

COMMERCIAL

    Craig Steven Development - 707 Lake Cook Road Restroom & Interior Renovations in Deerfield
    Job Cost: $125,723.00

    Port Clinton Property Management - Wenk Insurance & Hagerty Grain Co. Suite Build Outs
    Job Cost: $134,500.00

    Landmark Theatre Corp - Renaissance Place Cinema Millwork Renovation in Highland Park
    Job Cost: $62,419.00

    Port Clinton Property Management - Port Clinton Balcony Repair
    Job Cost: $40,000.00

    Southpoint Plaza Management - Added New Water Main to Evanston Shopping Center
    Job Cost: $163,000.00

MUNICIPALITIES

    City of Lake Forest - Historical Restoration of Communter Train Station
    Job Cost: $1,489,545.93

    Village of Winnetka - Structural Floor Replacement of Public Works Facility
    Job Cost: $435,280.00

    City of Lake Forest - Salt Storage Facility Modification
    Job Cost: $212,710.00

    Village of Deerfield - Splitter Box Repair at Water Treatment Plant
    Job Cost: $49,875.00

     Lake Bluff Park District - Platform Tennis ADA Ramp, Sidewalk & Curbs
    Job Cost: $48,950.00

    Highland Park Library - North Entry & Window Refurbishment Project (General Trades Package)
    Job Cost: $89,150.00

    City of Lake Forest - Public Safety Vertical Platform Lift
    Job Cost: $48,950.00

    Deerfield Park District - Front Entry Replacement of the Patty Turner Center
    Job Cost: $67,536.00 (see above before & after photos)

    Deerfield-Bannockburn Fire Department - Concrete Driveway Repairs at Fire Stations #19 & 20
    Job Cost: $41,140.00

        
EDUCATIONAL

    
Community High School District 128 - Installation of Vernon Hills High School Tennis Shelter
    Job Cost: $23,705.00

    Northeastern Illinois University - Building H, Interior Concrete Repairs to Overhead Beams
    Job Cost: $37,720.00

    
North Shore School District 112 - District-wide Concrete Replacement Program
    Job Cost: $44,750.00

    Avoca School District #37 - Concrete Leveling & Replacement at all Three Facilities in Glenview & Wilmette
    Job Cost: $38,621.00

    Northeastern Illinois University - Wall Partition and Classroom Remodel
    Job Cost: $35,080.00
















Web Hosting by iPage